top of page

Phase it in, protect quality, keep power affordable: what we heard at the Abuja Solar Policy Roundtable

Communications
Oct 30
2 min read

Updated: Nov 19

Government agencies, industry, researchers and civil society met in Abuja on 28 October to agree how Nigeria can build its own solar industry without putting reliable, affordable power out of reach.


How can Nigeria build a domestic solar industry and expand energy access at the same time? That was the question at the Abuja Solar Policy Roundtable, held on Wednesday 28 October 2026 at the Federal Secretariat, Abuja, under the theme Powering Access, Building Capacity.


The Roundtable was co-organised by GIFSEP and the Solar Power Nigeria campaign, with support from the Office of the Special Assistant to the President on Climate Change Matters. It brought together representatives of the Energy Commission of Nigeria, NASENI, NEMSA, and NESREA, alongside manufacturers, civil society and researchers. It follows the Kano Solar Dialogue and the Lagos Solar Forum.


The evidence. Director of the Centre for Renewable Energy and Sustainability Transitions (CREST) at Bayero University, Kano (BUK), Prof. Nasir Isa Fagge, presented a policy brief comparing three routes to local manufacturing: an immediate import ban, a phased transition over 3–5 years, and a tariff-based approach. The brief recommends the phased route, which 80% of experts consulted for the readiness research support.


Four messages from the room

1. Phase it in. An immediate ban would raise costs and cut supply before Nigerian factories can fill the gap. A predictable 3–5 year path, tied to real manufacturing capacity, is the way to build the industry.


2. Stop bad panels at the border. Participants called for SON, NEMSA and Customs to inspect consignments at ports before clearance, for regional testing laboratories, and for every installer to be certified. NEMSA described its work on installer certification, and NASENI noted that it offers panel testing to the public.


3. Build the whole value chain. The recommendations included:

•          zero import duty on raw materials;

•          a targeted tariff on finished imported modules;

•          tax holidays for certified manufacturers;

•          local content in government-funded electrification projects;

•          dedicated power and land for manufacturing zones;

•          long-term concessional finance.

Batteries, mounting structures, charge controllers and smart meters were identified as opportunities for Nigerian producers.


4. Keep people at the centre. An advocate for women with disabilities described losing most of her poultry farm to a power failure and being unable to afford solar. Participants agreed that affordability must stay at the heart of policy, and discussed reuse, recycling and take-back schemes for panels and batteries.


What happens next

The outcomes of the Abuja, Lagos and Kano dialogues will be consolidated into one policy brief for the government. For the Solar Power Nigeria campaign, the message is clear: local manufacturing and energy access are not in competition. With the right sequence (phase it in, protect quality, build the value chain and keep people at the centre), Nigeria can have both.(Read what we heard at COP31.).

Comments


bottom of page